Projects & Proof Gallery

Proof-first rule: yahan sirf real site photos aur verified jankari hai — customer naam, generation ya saving ke daave nahi.

Verified project entries

Har entry me wahi likha hai jo site par confirm hai. Naye project poore hote hi yahan judenge.

3kW rooftop solar plant panels on elevated structure

3 kW

Residential rooftop

Area:
Chhattisgarh
System:
On-grid, elevated structure
Structure:
PCC foundation, galvanized structure

Site challenge: Chhat par tanki aur pedon ki chhaya ka dhyaan rakhkar layout banana tha.

Work completed: Shade study ke baad panel layout, PCC foundation, safe DC/AC wiring, earthing, testing aur handover.

Installation team fitting solar panels on rooftop structure

3 kW

Residential rooftop

Area:
Chhattisgarh
System:
On-grid, elevated structure
Structure:
PCC foundation, galvanized structure

Site challenge: Installation ke dauran finishing aur wiring routing saaf rakhni thi.

Work completed: Structure fitting, panel mounting, conduit routing, earthing aur testing.

5kW three-phase rooftop solar plant rows

5 kW (3-phase)

Residential/commercial rooftop

Area:
Chhattisgarh
System:
On-grid 3-phase, elevated structure
Structure:
PCC foundation, galvanized structure

Site challenge: Bade plant me row alignment aur structure kasav ek jaisa rakhna tha.

Work completed: Structure work, panel rows, wiring, protection checks aur handover.

100kW solar plant panel rows at large site

100 kW

Commercial/industrial plant

Area:
Chhattisgarh
System:
On-grid ground/roof rows
Structure:
Site-specific structure design

Site challenge: Bade site par panel rows ki alignment aur uniform finishing.

Work completed: Row-wise structure, panel mounting aur site finishing.

PCC foundation block for solar mounting structure

—

Foundation close-up

Area:
Chhattisgarh
System:
—
Structure:
PCC foundation

Site challenge: Structure ki majboot neev ke liye sahi foundation.

Work completed: PCC foundation work as per site requirement.

Pehle site assessment, phir sahi faisla.

Shade, roof condition, load aur wiring dekhe bina final price ya generation ka vaada karna sahi nahi. Ham survey karke transparent quotation dete hain.